PET Semi Automatic Blow Molding Machine for 0.1-3L PET Bottle with Two-blower and One Heater
PLC
All operations and data are displayed on the same screen.Easy to operate and understand
blowing system
The blowing system is well laid out, with high quality fittings and joints chosen for longer life
clamping part
Clamping force : 100 KN
Mould opening stroke : 160 mm
The moving part of the mold is made of Japanese linear guide, which has the advantages of high rigidity and light and fast movement.
TYPE
|
ITEM
|
UNIT
|
PARAMETER
|
Container
|
Product material |
/
|
PET
|
Container volume |
L
|
2 (4 cavity)
|
|
Theoretical output |
PCS/H
|
1000-1800
|
|
Max.container diameter |
mm
|
115
|
|
Max.container height |
mm
|
360
|
|
Mouding
|
Max.mould plate Dimension(L*W) |
mm
|
470*350
|
Max.mould thickness |
mm
|
220
|
|
Clamping force |
KN
|
100
|
|
Mould opening stroke |
mm
|
160
|
|
Machine size and weight |
Main machine(L*W*H) |
mm
|
1450*600*1700
|
Main machine weight |
Kg
|
650
|
|
Oven (L*W*H) |
mm
|
1800*700*1400
|
|
Oven weight |
Kg
|
350
|
|
Max.heating power |
kw
|
3-10
|
Four core advantages to help efficient production
High efficiency and stability, excellent production capacity

Energy saving and environmental protection, reducing operation


Stable and durable, low failure rate

Full-process service
Features
01.
Intelligent servo drive system
02.
Highly efficient and energy-saving heating solutions
03.
Intelligent process control systems
04.
Reliable mechanical structure
Frequently Asked Questions
Answer: It depends on the model (single or multi-cavity). Standard machines produce 1,000–5,000 bottles/hour, while high-speed models can reach 10,000+ bottles/hour. We customize solutions based on yo...
Answer: Yes! Our machines support virgin PET and rPET (up to 30–50% recycled content, depending on bottle quality requirements). We optimize heating and blowing for stable performance.
Answer: With our quick mold-change system, switching takes 15–30 minutes (vs. 1–2 hours for traditional machines), minimizing downtime.
Answer: Advanced servo-driven machines save 20–30% energy vs. hydraulic models. For example, a 20-cavity machine consumes ~25–35 kW/h.
Answer: Our machines feature:Precision temperature control (±1°C)Automatic wall thickness adjustmentReal-time defect detection (rejects faulty bottles)
Answer: Regular maintenance includes:Daily: Lubrication, air pressure checksMonthly: Mold cleaning, heater inspectionYearly: Servo motor and hydraulic system overhaul
Answer: Yes! We offer turnkey solutions, including:Preform injection machinesBlow moldersConveyors, labelers, fillersQuality inspection systems
Answer: We provide:1–2 years warranty (core parts)24/7 remote supportOn-site technician dispatch (if needed)
Ordering Process for Our Blow Molding Machines:
Step | Stage | Description | Key Activities & Deliverables |
---|---|---|---|
1 | Initial Inquiry & Consultation | You contact us to express your needs. | • Submit your requirements (bottle design, output capacity, material). • Our technical team provides initial consultation and machine recommendations. |
2 | Technical & Commercial Proposal | We provide a detailed offer based on your needs. | • Receive a formal quotation including machine specifications, price, and delivery terms. • Layout drawing and performance data provided for review. |
3 | Proposal Review & Negotiation | We discuss and refine the offer to meet your expectations. | • Clarify technical details and commercial terms (payment, warranty, training). • Adjust the proposal as needed. |
4 | Order Confirmation & Contract Signing | The agreement is formalized. | • Sign a sales contract or acknowledge a Proforma Invoice (PI). • Provide an official purchase order (PO) from your company. |
5 | Payment (Advance) | You make the initial payment to secure production. | • Pay the first installment (e.g., 30%-50% of the total amount) as per the contract. |
6 | Machine Production & Testing | We manufacture and rigorously test your machine. | • We build the machine to your specifications. • A factory acceptance test (FAT) is conducted. You are welcome to witness it. |
7 | Final Payment & Shipping Preparation | You clear the balance payment before shipment. | • Settle the remaining balance upon successful FAT and before dispatch. • We prepare all shipping and customs documentation. |
8 | Packaging & Shipment | Your machine is securely packed and shipped. | • The machine is crated for safe international or domestic transport. • We arrange shipment and provide tracking details. |
9 | Installation & Commissioning | Our engineers assist with setup at your factory. | • Our technicians arrive at your site (if included in the contract). • The machine is installed, calibrated, and tested with your materials. |
10 | Training & Final Acceptance | Your operators are trained on the machine. | • Comprehensive hands-on training is provided. • Perform Site Acceptance Test (SAT) and sign the final acceptance certificate. |
11 | After-Sales Support | Our ongoing support begins. | • Warranty period activation. • Lifetime technical support and supply of spare parts. |

Contact us
- Taizhou Pinsheng Machinery Co., Ltd.
- Niqiaojin Village, Xicheng Street, Huangyan District, Taizhou City, Zhejiang Province
- 手机: 008613058799699
- Mail: tzpinsheng@163.com